Load Testing of equipment
is conducted using Water Bags,
calibrated Solid Weights or Load Cells.
Calibrated solid weights between 550kg / 5 500kg
Water Bags up to 40T
Calibrated Load Cells: 5T, 10T, 20T and 30T.
REFURBISHMENT
REPAIRS & MAINTENANCE OF CRANES
Installation of a new Loop System
Service of hoist
Refurbishments
DESIGN AND INSTALLATION OF ELECTRIC PANELS
ASSISTING WITH SPECIALISED LIFTS
LIFELINES AND ANCHOR POINTS
ROPE ACCCESS
By using Rope Access all inaccessible areas can be reached in a matter of hours – only authorised / inspected anchor point are utilised and all equipment is inspected by competent persons before use